Skip to main content
Energy Lab
Systems lab

Hydroelectric power plant lab

Explore the dam. Operate each unit. Follow water and energy.

Simulation running
Generating
Generating
Generating
Loading 3D plant…

Drag to orbit · scroll to zoom · select a unit or component to inspect. Display rotation is slowed 1:20.

Total output21.66 MW
Turbine discharge46.06 m³/s
Net head54.66 m
Accumulated energy0.000 MWh

Turbine type changes runner geometry, operating envelope and the estimated efficiency curve.

Hiding and disassembly are for inspection; they do not remove parts from the calculation model.

Live performance analysis

0 s
Power vs time0.02.04.06.18.10 s10 sMW
Simulation time: 0.0 sT1: 7.22 MWT2: 7.22 MWT3: 7.22 MW
Hover or touch to inspect a sample. Last 180 seconds of simulated time.

Water and energy paths

Reservoir65.00 mIntakes and penstocks46.06 m³/sTurbines22.56 MWGenerators21.66 MW
Inflow 48.00 m³/sSpillway discharge 0.00 m³/sOverflow at maximum level 0.00 m³/sStorage change 1.93 m³/s
Penstock loss0.15 MWTurbine loss2.14 MWGenerator loss0.90 MW

Generating-unit comparison

Measurement
StatusGeneratingGeneratingGenerating
Electrical power7.22 MW7.22 MW7.22 MW
Discharge15.35 m³/s15.35 m³/s15.35 m³/s
Water velocity1.91 m/s1.91 m/s1.91 m/s
Net head54.66 m54.66 m54.66 m
Head loss0.34 m0.34 m0.34 m
Rotational speed375.0 RPM375.0 RPM375.0 RPM
Generator frequency50.0 Hz50.0 Hz50.0 Hz
Turbine efficiency91.3 %91.3 %91.3 %
Generator efficiency96.0 %96.0 %96.0 %
Net-head pressure equivalent5.36 bar5.36 bar5.36 bar
Shaft torque191.5 kN·m191.5 kN·m191.5 kN·m
Accumulated energy0.000 MWh0.000 MWh0.000 MWh
Methodology, assumptions and model limits

A fictional educational plant, not data from a real dam. Efficiency curves and envelopes are generic estimates, not certified manufacturer curves.

P = ρgQHnetηtηg · v = Q/A · hloss = (fL/D + K)v²/(2g) · n = 120f/p · dV/dt = Qin − Qturbines − Qspill − Qevap − Qoverflow

Reservoir balance uses constant surface area and steps no longer than one second. Runoff has a first-order lag. The grid and test bench are idealized; water hammer, cavitation and structural stresses are not solved. Displayed pressure is a net-head equivalent, not a sensor-location measurement.

Scene proportions are illustrative. Display rotation is slowed 1:20; RPM and calculations use engineering speed. Editing head resets the experimental water level and does not add generated energy to the record.

All simulation results: Estimated — calculated under the stated assumptions.